A FULLY EQUIPPED SANCTUARY FOR RESTORATION
Ethan Mercy Rehabilitation &
Skills Acquisition Center.
Goal: A fully equipped center to train only repented prisoners in marketable skills before they rejoin society.
THE CRISIS WE ARE SOLVING
Breaking Nigeria's 70% Ex-Inmate Relapse Cycle
Over 70% of ex-inmates in Nigeria relapse within 3 years due to stigma, lack of skills, and no economic support. Rivers State correctional facilities are overcrowded, and many repentant prisoners are released without tools to rebuild their lives. This cycle fuels recidivism, insecurity, and strain on state resources.

Completed Main Entrance Gatehouse & Security Portal
Physical realization of the approved architectural design: reinforced security gatehouse, heavy-duty sliding access gates, visitor reception, and tarred access road along the Abara-Ozuzu route in Etche LGA.

Panoramic View of Completed Complex Wings
Panoramic view of the completed single-story facility blocks painted in signature warm tones, internal road kerbing, solar streetlighting poles, and expansive sanctuary grounds.

Hostel Accommodations & Resident Living Quarters
Fully furnished residential dormitory prepared to house returning citizens, featuring double-decker metal bunk beds, brand new Mouka foam mattresses, pillows, ceiling fans, and sanitary tiled flooring.

Integrated Agro-Allied Vocational Center
Agricultural practical training infrastructure equipped with an operational horticulture greenhouse dome, elevated water reservoir (Mario tank), livestock pens, and circular aquaculture fish-farming unit.

Finished Residential & Training Blocks
Finished single-story training and residential blocks with perimeter drainage, solar lighting, and graded internal avenues in Etche Local Government Area.

Furnished Trainee Dormitory Wing
Spacious dormitory wing designed to accommodate 120 trainees per 6-month cycle in dignified, secure, and restful conditions.

Perimeter Security Wall & Access Road
Exterior roadside perspective showing the high-security perimeter block wall, electrical infrastructure, completed gatehouse, and paved road connecting the foundation directly to Port Harcourt.

Interior Training Wing & Trainee Storage
Interior administrative and training hall fitted with custom wooden storage locker cabinetry, architectural pillars, and modern ceiling fixtures.

Livestock Husbandry & Fish Farming Unit
Practical livestock breeding pens, poultry enclosures, and fish tanks providing beneficiaries with commercially viable agricultural trades.

Commercial Poultry Training Shed
Ventilated poultry shed with water delivery piping, prepared for hands-on poultry rearing, egg production, and agro-business training.

Vocational Assembly & Orientation Hall
Wide interior view of the multipurpose hall designed for communal orientation, counseling sessions, moral reform lectures, and trade demonstrations.

Campus Courtyard & Internal Avenue
Central internal avenue linking the vocational workshops, administrative wing, and resident living quarters.

3D Proposed Complex Master Overview
Aerial architectural render showing the layout of the central training complex, 3-bay technical workshops, dual hostel accommodations, sports court, and secure perimeter wall along Abara-Ozuzu Ochokocho Road.

Complex Main Entrance & Security Gatehouse (Architectural Render)
Original 3D entrance archway and security render — compare with the completed gatehouse photo above to see how accurately the design was realized.

Groundbreaking & Foundation Laying Ceremony
Community leaders, Pastor Martin Agwu of the International Prison Ministry, Pastor Runson & wife, Agatha U. Aidomojie, and foundation trustees dedicating the complex ground.

Historical Milestone: Structural Roofing & Plastering
Progress view during the structural roofing and exterior plastering phase across the training complex and hostel accommodations in Etche LGA.

Historical Milestone: Structural Masonry & Wall Walling
Active blocklaying and foundational structural walling along the Abara-Ozuzu Ochokocho Road site in Etche Local Government Area, Rivers State.

Internal Campus Courtyard & Administrative Wing
Planned landscaped internal campus drive connecting the administrative reception, counseling offices, and residential hostels.

Accessible Training & Reception Entrance
Inclusive facility design featuring wheelchair-accessible ramps, sunlit classrooms, communal cafeteria access, and counseling rooms.

Mission Dedication & Spiritual Foundation
Dedication prayer sessions uniting ministry leaders, legal volunteers, and community partners behind the cause of restoration and second chances.

A Quiet Space for Inner Rebirth
The rehabilitation complex is purposefully planned with quiet meditation and counseling rooms, giving individuals space to heal and refocus on their future.
The 4 Core Wings of the Rehabilitation Sanctuary
Constructed along Abara-Ozuzu Ochokocho Road in Etchie LGA, Rivers State, our complex integrates residential, educational, and spiritual restoration.
Central Training Complex
Multipurpose complex featuring classrooms, administrative offices, reception, conference room, and a communal cafeteria.
3-Bay Technical Workshop
Expansive industrial halls built for heavy craftsmanship: welding & fabrication, solar inverter laboratories, plumbing, and aluminum assembly.
2 Residential Hostel Blocks
Safe, dignified dormitory accommodations designed to house enrolled trainees during their immersive rehabilitation cycles.
4-Apartment Mini-Staff Quarters
Dedicated on-site housing for instructors, counselors, and operational personnel to support 24/7 care and security.
LOCATION & SCOPE
Site Specifications
- Project Name:Ethan Mercy Rehabilitation & Skills Acquisition Center
- Official Location:Abara Etche in Etche L.G.A, Port Harcourt in Rivers State, Nigeria
- Target Beneficiaries:Only repented prisoners committed to moral reformation and productivity
- Cycle Capacity:120 inmates per 6-month training cycle = 240 beneficiaries yearly
- 9 Core Trades:Carpentry, Tailoring, Electrical/Solar, Catering, Auto Mechanic, ICT, Plumbing, Tiling/Masonry, Welding
- Graduation Linkage:Starter packs, recognized certification, and linkage to microcredit + business mentorship
PROJECT TIMELINE
Development Milestones
Land Acquisition & Groundbreaking
Securing the expansive Etche LGA site, topographic mapping, perimeter boundary demarcations, and the official foundation laying dedication.
Structural Masonry & Framing
Substructure completion, concrete columns, and blocklaying for workshop wings, classroom blocks, and administrative facilities.
Roofing, Plastering & Perimeter Gatehouse
Aluminium roofing, external plastering, painting, solar streetlighting installation, and completion of the main entrance security gatehouse.
Hostel Furnishing & Agro-Allied Farm Setup
Installation of bunk beds, Mouka mattresses, greenhouse horticulture dome, poultry shed, and aquaculture fish-farming unit.
ACCELERATE CONSTRUCTION
Help lay the next block in Rivers State.
Every bag of cement, solar panel, and structural beam brings a permanent sanctuary of restoration closer to opening its doors for released men and women.
A NEW CHAPTER STARTS WITH US
